Coupler And Decoupler Used With Lightning Impulse Simulation Tester
Kast Eng Co. LTD. (Kast Eng Co. LTD.)
All electric equipments & systems is required Impulse Simulation Test to the to be tested under the condition where the power source is applied to the product-under-test.
At this test condition, the decoupler is needed to reduce the impulse flowing through the power line while testing.
And the coupler which is inserted between tester and product, to simulate the actual condition, so the electric circuit of decoupler is prescribet by IEC rules.